103 Information Technology 103-01-00 Additional instructional equipment to enhance the delivery of instruction 103-01-01 Install a ceiling-mounted video projector in room 303 of the Bedford Center $0 None The TVs currently used to display video classes don't have the resolution to display computer images which are frequently used by instructors.  The projector will provide the required resolution
        103-01-02 Purchase and install equipment to enable additional receive site at the Bedford center to receive compressed video classes $17,500 ETF This will enable instructors to originate classes from these centers to provide the ability for more video classes and for classes originated from the main campus to be taught from the off-campus centers during the semester.
        103-01-03 Install 1 ceiling-mounted projector in the compressed video room at the Bedford Center
$9,000 ETF The room is currently equipped with televisions that are too small to be seen clearly from the back of the room and the TVs don't support the resolution required to support PC content.  This is more important than the ability transmit and receive from the
        103-01-04 Install ONE ceiling-mounted projectors for room 5141 (Tobacco Commission) $9,000 G/O 29
        103-01-04 Install ONE ceiling-mounted projectors for room 5213, 4210, 2209 or 312 at the Bedford Center. $9,000 W The rooms on the main campus warrant a permanently installed ceiling-mounted projector based upon the requests for portable projectors in these rooms.  
        103-01-05 Fund the equipment and personnel services to provide wireless coverage in all buildings on the main campus and at the off-campus centers, excluding Bedford Hall. $15,000 TF In order for the faculty members to take full advantage of their portable devices, this infrastructure is necessary.
    103-02-00 Maintain current IT resources through a replacement cycle and replace equipment that is no longer supported 103-02-01 Replace servers that are more than 4 years old $20,000 ETF This is needed provide stable IT services to faculty, staff and students.  It is also a requirement of the Chancellor's Expectations.
        103-02-02 Replace network printers on a six year replacement cycle $12,000 ETF The network printers we are seeking to replace are more than 6 years old
        103-02-03 Replace Cisco equipment that has reached its end-of-life  $52,000 ETF This equipment can no longer by supported by a maintenance agreement.
        103-02-04 Replace desktop PCs, MAC's and loaner PCs.  This cost includes 15 portable devices for full-time faculty members $116,270 ETF This is required to comply the Chancellor's Expectations of a 4-year replacement cycle for PCs.
        103-02-04 Replace desktop PCs, MAC's and loaner PCs.  This cost includes 15 portable devices for full-time faculty members $23,730 W 1
        103-02-05 Replace the projectors in rooms 2401, 2404, 2407, 2411 & 2205 $30,000 ETF These are outdated projectors that have substandard resolution, lumens, and don't have speakers.
        103-02-06 Replace the current imaging/management server for the apple computers $2,600 ETF The current server is out-of-date and does not provide the ability to manage the apple computers.
        103-02-07 Increase the projector bulb budget by $2,500.  The current budget is $5,000.   $2,500 M&O We continue to add ceiling-mounted projectors and our $5,000 budget was deleted in early March.
      Provide the finest educational equipment and facilities to achieve excellence in education. 103-02-08 Obtain 20 Remote Point Navigator 2.4 remote controls for video data projectors in classrooms/computer laboratories. $2,400 TF Remote Point Navigator remote controls are needed by faculty when making presentations during lectures.  This will enable them to move around the classroom and not be restricted to sitting at the computer.
    103-03-00 Support for off-campus centers 103-03-01 Full-time IT support $32,000 W Needs to be well-versed in all aspects of IT.  Pay grade 5.  The viability of the off-campus centers is directly proportional to availability of IT services.
    103-04-00 Compliance with SEC 501 103-04-01 3 additional servers (1each) at the Bedford Center, the Altavista Center and the Brookneal Center $8,100 ETF These are required to separate the student domain from the administrative domains as required by SEC 501
        103-04-02 Intrusion Detection $25,000 TF This is required by SEC 501
        103-04-03 Rewire and secure the network infrastructure in Merritt and Campbell Halls.  Secure the network infrastructure in Appomattox Hall. $60,000 TF This is required by SEC 501
        103-04-04 Secure the network equipment at the Altavista and Brookneal Centers $8,000 TF This is required by SEC 501
        103-04-05 Build a office for the new security position and equipment with furniture DELETE $0 None This position is mandated and funded by the VCCS to complete the tasks required in SEC 501